Before nstallng the pump n ts place,
Sucton and dscharge flanges should properly be cleaned.
ATTENTION- Pump should be nstalled n a locaton where there s not exploson and
frost hazard and has good ar condtonng.
- There should be enough area around pump for reachng pump easly, for
mantenance and there should be enough space and heght to lft the pump f
necessary.
-Pump sucton ppe should be as short as possble.
If BTKF-I pumps are nstalled over a ppe whch s well supported or over ground by
means of base plate.
-BTKF-I pumps can be mounted to flat ppes vertcally or horzontally.
Flow can be from upwards to downwards or reverse n pumps whch are connected
vertcally. (Provded that pump flow drecton has been connected correct)
Motor axs can be n vertcal or horzontal poston n pumps whch are connected to
horzontal ppe motor should never reman below the horzontal plane.
Pump whch s nstalled over a pump ground can be mounted to a flexble ppe by
means of base plate.
ATTENTION:- You should be carefully work at pump nstallaton ground preparaton
and nstallaton of pump group nto ts place. Incorrect and careless nstallaton
causes early wearng of pump parts and falures.
- Pump ground should be so heavy to absorb vbratons and sturdy to prevent bends
and adjustments defects. Ground concrete should completely be soldfied,
completed ts plug tme and proper stud bolts are placed n pump frame fixng holes
and proper fixng lugs should be placed for usng n makng connectons wth weldng.
Concrete and plate upper surface should be horzontal and very smooth.
-Place the pump group over concrete ground and put or remove steel wedges under
frame and adjust the flanges. Provde that pump shaft completely n horzontal
poston.
-Tghten the anchorage stud bolts properly.
Installaton of Ppe Lne Installaton
-Nomnal dameter of pump dscharge and sucton pumps are not an ndcator for
correct dameters for dscharge and sucton ppes.
- It should be controlled that crcks and stresses and ppe weght do not effect pump.
GENERAL
Fl uid
So lut ion s
6