
WS Rev. E Models
Installation and Operations Manual
1.
correct unit has been shipped.
2. Inspect all electrical connections
copper pipe.
3.
4.
⚠⚠
health/safety concerns. For these reasons, only qualified
Enertech Global has set forth this policy to ensure
base of the unit. All units should be located in an indoor area
⚠⚠