
MNL-000700
Rev B 1 www.ess.to
January 2017
TABLE OF CONTENTS
1. INTRODUCTION..................................................................................................................................2
2. PRECAUTIONS....................................................................................................................................2
3. INSPECTION UPON RECEIPT OF GOODS.......................................................................................3
3.1 General..................................................................................................................................3
3.2 Visible damage......................................................................................................................3
3.3 Concealed damage ...............................................................................................................3
3.4 Return of damaged goods.....................................................................................................3
4. SYSTEM OVERVIEW ..........................................................................................................................3
5. GENERAL SYSTEM SPECIFICATIONS…………………….................................................................4
5.1 DC Output Characteristics.....................................................................................................4
5.2 Batteries.................................................................................................................................4
5.3 Grounding………………………………………………………………………… ........................4
5.4 Environmental Conditions......................................................................................................4
•Cabinet Dimensions..................................................................................................................4
•Cabinet Weights (Assembled) ..................................................................................................5
6. INSTALLATION PROCEDURES..........................................................................................................5
6.1 Preparation............................................................................................................................5
6.1.1 Necessary Equipment and Tools ..........................................................................5
6.1.2 Equipment Inspection............................................................................................5
6.1.3 Safety Precautions ................................................................................................6
7. INSTALLATION STEPS.......................................................................................................................6
7.1 Cabinet Location....................................................................................................................6
7.2 Cabinet Mounting ..................................................................................................................6
7.3 DC Connections ....................................................................................................................7
7.4 Grounding..............................................................................................................................7
7.5 System Operation..................................................................................................................7
8. SYSTEM MAINTENANCE....................................................................................................................8
8.1 Blown Fuse Replacement......................................................................................................8
8.2 Battery Replacement Steps...................................................................................................8
9. WARRANTY RELATED MAINTENANCE
10. DRAWINGS/SCHEMATICS...............................................................................................................10
•General Cabinet Drawing..........................................................................................................10
•Anchor Specifications ...............................................................................................................11
•Anchor Placement Dimensions.................................................................................................12-13
•480V, EFC52 Top Breaker – Mechanical/Electrical Drawing...................................................14
•384V, EFC52 Top Breaker – Mechanical/Electrical Drawing...................................................15
•360V, EFC52 Top Breaker – Mechanical/Electrical Drawing...................................................16
•384V, EFC42 Top Breaker – Mechanical/Electrical Drawing...................................................17
•288V, EFC42 Top Breaker – Mechanical/Electrical Drawing...................................................18
•480V, EFS52 Side Breaker – Mechanical/Electrical Drawing ..................................................19
•384V, EFS52 Side Breaker – Mechanical/Electrical Drawing ..................................................20
•480V, EFC54 Top Breaker – Mechanical/Electrical Drawing...................................................21
•384V, EFC54 Top Breaker – Mechanical/Electrical Drawing...................................................22
•360V, EFC54 Top Breaker – Mechanical/Electrical Drawing...................................................23
•384V, EFC44 Top Breaker – Mechanical/Electrical Drawing...................................................24
•288V, EFC44 Top Breaker – Mechanical/Electrical Drawing...................................................25
•480V, EFS54 Side Breaker – Mechanical/Electrical Drawing ..................................................26
•384V, EFS54 Side Breaker – Mechanical/Electrical Drawing ..................................................27
•360V, EFC51 Top Breaker – Mechanical/Electrical Drawing...................................................28
•Notes Page ...............................................................................................................................29