EHS ALC1-1PSY-6 Manual de usuario

1 www.ehs-heating.com
EHS Combination and System Boilers
Installation Manual
Heating for the Renewable Future
Please read through the whole instructions before removing the boiler from its packaging and installing
and operating the appliance.

2 www.ehs-heating.com
!! IMPORTANT NOTICE !!
UNDER NO CIRCUMSTANCES MUST THIS BOILER
BE CONNECTED TO THE MAINS POWER WHILST
THE BOILER IS DRY.
THE BOILER MUST BE FILLED WITH WATER AND
PRESSURE TESTED PRIOR TO ELECTRICAL
CONNECTION.
FAILURE TO DO SO WILL INVALIDATE THE
WARRANTY

3 www.ehs-heating.com
INDEX
1. INTRODUCTION
2. HEALTH AND SAFETY
3. ESSENTIAL INSTALLER CHECKS TO BE MADE BEFORE UNPACKING AND INSTALLATION
4. INSTALLATION REGULATIONS
5. BOX CONTENTS AND UNPACKING
6. ELECTRIC BOILER SCHEMATICS
6.1. Combination Boiler Schematic
7. INSTALLATION STEPS
7.1. Positioning and Wall Mounting the Boiler
7.2. Design and connect the plumbing system
7.2.1. Typical S plan Layout for system boiler.
7.2.2. Typical layout for Combination Boiler
7.3. System Piping Layout Design
7.3.1. Design Considerations
7.3.2. Heating And Hot Water Connections
7.4. Flush and Fill Boiler.
7.4.1. Flushing
7.4.2. Heating System Fill.
7.4.3. Hot Water System Fill
7.5. Electrical Connections
7.5.1. Electricity Connection Precautions
7.5.2. Electrical Supply Connections
7.5.3. Thermostat connections
7.6. Powering On and Setting the parameters
7.6.1. Power On
7.6.2. Set The Boiler Parameters
7.7. Set Pump Speed and Purge Air
7.7.1. Initial Checks
7.7.2. Turn On the Boiler
7.7.3. Set The Thermostat
7.7.4. Purge Air from The System
7.7.5. Set Pump Speed
7.7.6. Set Automatic Bypass Valve
7.7.7. Check System Pressure and Top Up As Required
7.8. Set Domestic Hot Water (DHW) Flow & Temperature
8. AFTER INSTALLATION OF MAIN BOILER
8.1. Heating Check
8.2. Hot Water Check
9. OPERATION OF CONTROLS
10. TROUBLESHOOTING GUIDE
11. ELECTRICAL WIRING AND TECHNICAL DATA
12. BOILER MAINTENANCE
13. WARRANTY

4 www.ehs-heating.com
EHS Electric Combi and System Boilers
1. Introduction
The EHS Electric Boiler range will give years of trouble-free service and the following instructions will assist you in
obtaining the best performance and most economical settings for your appliance.
ATTENTION: Only qualified engineers and approved service engineers are recommended for installing and servicing
this product. Unqualified personal and the use of nonstandard parts can be dangerous and will invalidate the
manufacturer’s warranty.
The installation must be performed in accordance with current IEE Wiring Regulations, Building Regulations, Water
Fitting Regulations (England and Wales) or Water Bylaws (Scotland) and all relevant British standards.
It is very important that you have read and fully understood this manual before installation of the EHS Electric
Boilers to ensure their long life. This instruction manual should be kept in a place close to the appliance for easy
reference. Please read the whole manual before attempting installation and follow these installation instructions
and operating instruction to ensure long life of this EHS Boiler. These instructions must be conserved and given to
any new user.
All EHS Electric Boilers are guaranteed from manufacturing defects for a full 5 years. To ensure that you are eligible
for this guarantee you must register the boiler at www.ehs-heating,com within the time specified in the warranty
terms and conditions. This can be found at the back of this manual and on the EHS website. The warranty relates to
any manufacturing defects and covers the replacement of any faulty parts. The guarantee does not cover any
damage or faults that are a consequence of poor installation or faults caused by leaks within the boiler. It is
therefore very important that all connections are thoroughly checked by the installer prior to leaving it with the
customer. All work that takes place under the guarantee must be agreed with EHS prior to commencing the
installation.
This appliance must only be used and programmed by an authorised adult. It should not be used by children or
anyone who has not read the installation manual. If in doubt, seek expert advice.
2. HEALTH AND SAFETY
At EHS we take every precaution where possible to design and manufacture our products to meet the safety
requirements, when installed and operated according to the correct procedures. All products are comprehensively
examined and tested before despatch.
Under the Consumer Protection Act 1974 it is a requirement to provide information on substances harmful or
hazardous to health (COSHH Regulations 1988)
Materials used in the manufacture of this appliance are non-hazardous and do not require any special precautions
when fitting or servicing this appliance.
It is the responsibility of the user or engineer to use the correct Personal Protective Equipment and Clothing when
installing or working on this appliance.

5 www.ehs-heating.com
3. ESSENTIAL INSTALLER CHECKS TO BE MADE PRIOR TO INSTALLATION
3.1. Carry out all heat loss calculations on the property and make sure that this boiler is suitable for the
installation. EHS can assist with these calculations. Should you require this service please contact
[email protected]. HEAT LOSS CALC DONE?
3.2. For combination boilers you will need to carry out a hot water calculation to ensure that the boiler has a
sufficient heat output to provide the correct temperature & flow of water required for the application.
This will depend on flowrate required. If you need help calculating this, please contact info@ehs-
heating.com. HOT WATER CALCULATION DONE?
3.3. Check the mains water pressure - The maximum pressure of the units is 6bar, where water pressure is
close to or varies around this limit a pressure reducing set on the mains supply should be installed.
MAINS WATER PRESSURE CHECK OK?
3.4. Check that the power supply to the premises meets the minimum requirements of the unit being
installed. PREMISES POWER SUPPLY SUFFICIENT?
3.5. Carry out a voltage and load test to determine the correct sized cable and breaker is used. VOLTAGE
AND LOAD TEST DONE? CABLE SIZE mm? BREAKER (AMPS)?
3.6. Check the central heating design is suitable for the application (Detailed recommendations are provided in
BS EN 12828 and BS EN 6700.) SYSTEM DESIGN
COMPATIBLE WITH PART L OF THE BUILDING REGULATIONS
3.7. If installing a combination boiler, check that the hot water flow rate from the boiler will be sufficient for
the application.
HOT WATER FLOWRATE OF COMBI BOILER SUFFICIENT?
3.8. When siting the boiler, consider the requirements for servicing the boiler (i.e. space around and in front of
the boiler) and ensure that it is fitted in a location that cannot be accessed by unauthorised/unqualified
people or children.
3.9. Make sure that this boiler is not installed in a shower compartment or bathroom.
3.10. The Boiler must be installed in an Upright position
3.11. Check that the boiler will be mounted on a suitable wall that can bare the weight of the boiler.
3.12. Ensure that all six fixing points are used when fixing the boiler to the wall.
Please make sure you have performed all the necessary checks above prior to opening the packaging, as
we cannot take the product back for a free return if the packaging has been opened.
Finally, you can unpack the boiler from its packaging.
PLEASE NOTE EHS ARE NOT RESPONSIBLE FOR ANY FAILURES SHOULD THE ABOVE TERMS NOT BE MET

6 www.ehs-heating.com
4. Installation Regulations
4.1. Installation of the boiler must comply with the following
standards:
4.1.1. The local building regulations
4.1.2. UK building regulations
4.1.3. BS EN 12828 - Heating systems in buildings: Design for water-based heating systems.
4.1.4. BS EN 12831 - Heating systems in buildings: Method for calculation of the design heat load.
4.1.5. BS EN 14336 - Heating systems in buildings: Installation and commissioning of water-based heating
systems.
4.1.6. BS7671 - Requirements for electrical installations. IEE Wiring Regulations. Seventeenth edition.
4.1.7. BS EN 7593 - Code of practice for treatment of water in heating systems.
5. Unpacking and installation:
5.1. These appliances can weigh up to 28kg so please be aware that you will need 2 people to manually
move and unpack the appliance.
5.2. Cut the seals as detailed below taking care not to penetrate inside the box otherwise this may
scratch the appliance.
5.3. Fold the box lids back and remove the centre soft polystyrene packing
5.4. With one person at either end, lift the boiler gently out of the box.
5.5. Box Contents
5.5.1. Electric Boiler
5.5.2. 2 x (or 4 for Combi) Tectite Pipe connections
5.5.3. Wall mounting guide
5.5.4. 3 Expanding Wall bolts.

7 www.ehs-heating.com
6. Electric Boiler Schematics
EHS System Boiler 1 Phase
NO.
Name
QTY
NO.
Name
QTY
NO.
Name
QTY
1 Signal line 1
11
Water pump 1
21
Electric control box components
1
2 Heater 1
12
Water flow switch G3/4 1
22
Wire 1
3 Single layer bracket 2
13
Water temperature probe D18
1
23
Cable Connector 1
4 Single valve 1
14
Water tank pipe 1
24
Body parts 1
5 Pressure switch 1
15
Pressure relief pipe 1
25
Expansion tank 5 litres - left side
1
6 Pressure gauge 1
16
Pressure relief valve
3 bar 1
26
Connecting wire 1
7 Pressure gauge mount
1
17
Thermostat 10A 1
27
Heating outlet pipe 1
8 Expansion board 1
18
Thermostat 60A single phase
1
28
Heating inlet pipe 1
9 Display B1006 1
19
Electronic control board 1
29
Cover 1
10
Display screen cover
1
20
Electric control box cover 1

8 www.ehs-heating.com
EHS Combination Boiler 1 Phase
NO.
Name
QTY
NO.
Name
QTY
NO.
Name QTY
1 Signal line 1
13 Display screen cover 1
25 Thermostat 60A single phase
1
2 Heater 1
14 Water pump 1
26 Electronic control board 1
3 DHW heater 1
15 Water flow switch G3/4
1
27 Electric control box cover 1
4 SHW SCR 1
16 Water flow sensor 1
28 Electric control box
components 1
5 DHW thermostat
60A
17 Water temperature
probe D12 1
29 Wire 1
6 Pressure switch 1
18 Water temperature
probe D18 1
30 Cable Connector 1
7 Pressure gauge 1
19 Water tank pipe 1
31 Body parts 1
8
Pressure gauge card
board 1
20 Pressure relief pipe 1
32 Expansion tank 5 litres - left
side 1
9 Double layer
bracket 2
21 Pressure relief valve
3 bar 1
33 Connecting wire 1
10 Double valve 1
22 DHW outlet pipe 1
34 Heating outlet pipe 1
11 Expansion board 1
23 DHW inlet pipe 1
35 Heating inlet pipe 1
12 Display B1006 1
24 Thermostate 10A 1
36 Cover 1

9 www.ehs-heating.com
7. Installation steps
7.1. Positioning and Wall Mounting the Boiler
IMPORTANT:
When choosing a location to mount the boiler it is important that you consider clearance, servicing
of the boiler, and safe and suitable operation.
When power is supplied, the boiler should only ever be opened by a qualified electrician after first
isolating the electrical supply.
The boiler should be fitted out of the reach of children and people without the right skills and
qualifications. If there is the possibility that the boiler could be opened without first isolating the electrical
supply then you must install it in a fashion that prevents access to the boiler, such as a lockable cupboard.
The wall that you choose to mount this boiler on should be strong enough to support the boiler
when full.
EHS recommend at least 100mm clearance from all fixed obstructions on all sides of the boiler. Allow plenty of space
at the base of the boiler for fitting the hot and cold-water pipes and isolation valves.
Step 1. Drill 5 holes as per the included wall mounting diagram. The upper 3 holes should be Φ8mm
diameter, and the lower 2 holes Φ6mm.
Step 2. Secure the 3 Φ8mm expansion bolts into the top three holes
Fig 1 Fig 2
Step Three : Hang the boiler from the top three bolts before securing the boiler to the wall using standard
fastenings at the bottom

10 www.ehs-heating.com
Screw 3 x screws into 3 upper expansion screw bolts
Step Four: Hang the boiler on the 3 fixed screws. Then drill 2 screws into 2 under expansion screws
Este manual sirve para los siguientes modelos
3
Tabla de contenidos

















