
Installing Optional Ceiling Trim Kit
The lower section of the Micro Projector Lift Plenum is available as part of a
ceiling trim kit, to finish out the ceiling opening even if a plenum housing is not
necessary. This kit consists of the lower section of the plenum housing and the
optional closure panel. Please refer to drawing belowfor these instructions.
➀Install Micro Projector Lift as previously described in these instructions.
➁Install bottom section of plenum housing in opening. This can be
accomplished by suspending with wire, or by mounting directly to the ceiling
joists (if space permits).
Ceiling tile
(by others)
Lower section of
Plenum Housing
Assembly/Installation Instructions
Micro Projector Lift Closure and Ceiling Trim Kit by Draper
If you encounter any difficulties installing your Micro Projector
Lift Closure or Ceiling Trim Kit, call your dealer or Draper, Inc. in
Spiceland, Indiana, 765-987-7999, fax 765-987-7142, or E-mail
Installing Ceiling Closure
If your Micro Projector Lift is equipped with a ceiling closure system, it can be
used as is, or in conjunction with a square of existing ceiling tile. Please refer to
diagram below for these instructions.
➀If installing with ceiling tile, you may need to cut tile so that its overall
dimensions are the same as (or slightly less than) the closure panel. Place
tile into trim frame. Lay closure panel on top (back side) of ceiling tile, and
tighten screws to hold in place.
➁Attach
5
/
16
" threaded rods to pem nuts in lift pan.
➂Run unit “up” until bottom pan stops at highest position. Mark position on
5
/
16
" rods even with ceiling level and cut rods to length (removing from
pan if convenient).
➃Run unit “down” until bottom pan stops at “show” position.
➄Attach closure to lower end of
5
/
16
" rods by slipping into four corner slots
and secure with nuts above and belowslots.
➅Run unit “up” again to highest position. Measure distance by which panel
fails to reach required “closed” height for surrounding ceiling.
➆Run unit “down” then readjust mounting of
5
/
16
" rods in traveling grid to raise
panel required distance.
➇Test unit operation to confirm that panel will stop in closed position just
before touching ceiling.
NOTE: Immediately upon completion of the surrounding ceiling, units should be
operated to confirm that optional ceiling closure panel stops just short of touch-
ing ceiling in closed position.