Clearfield FieldSmart FxHD Manual de usuario

FieldSmart®FxHD Frame
Installation Manual ______________________________________________________
Manual 014815 REV C - Feb 2018

Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
2
FieldSmart®FxHD Frame
Installation Manual _________________________________________________________
Manual 014815 REV C - Feb 2018
Table of Contents
Application 3
Description 3
Technical Specications 3
FxHD Frame Installation 4
Standard Floor Installation 8
Raised Floor Installation 10
FxHD Frame Installation Continued 14
Adjusting the Doors 16
Clearview Blue Patch & Splice Installation in FxHD 17
Clearview Blue Patch Only Installation in FxHD 19
Jumper Routing Guide 21
Connector Cleaning Procedure 30
Standard Warranty 33
Proprietary Notice 34
Technical Support 34

3
FieldSmart®FxHD Frame
__________________________________________________________ Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
Manual 014815 REV C - Feb 2018
Application
With the FieldSmart FxHD front access design, Clearview® Cassettes are
shifted to the outside of the frame and away from a xed panel conguration.
Instead of traditional panel congurations, the frame is congured with a series
of Clearview Blue cassettes teamed with building brackets built into user-
dened building blocks. The FxHD Frame provides the ultimate in modularity
and exibility to scale from 12 to 2,016 ports in any ber count, optimizing your
ability to maximize ber investment and assets. Clearview Blue’s in-cassette
buffer tube storage allows the FxHD to reclaim the space used for traditional
panels and mass buffer storage and to redeploy it by using building blocks of
Clearview Blue Cassettes.
Description
The FieldSmart High Density Fiber Crossover Distribution System (FxHD) is the highest density ber management frame
solution available in the industry today, providing 2,016 SC terminations in a 7’ frame or when mounted back- to-back, FxHD
supports a maximum density of 4,032 terminations in a space savings footprint of 9 cubic feet (36” x 36”).
Those deploying the FieldSmart FxHD can start with one Clearview Blue Cassette and add additional cassettes as
additional capacity is needed, up to a total of 168 cassettes and 2016 ports of connectivity. With instant access to all
cassettes, adapters and jumpers, the frame is designed as a front access frame. The FxHD can be placed against a wall,
cage in data center collocation environments or installed back to back.
User-dened Clearview building blocks congured to exact port count specications can be deployed in seconds with
Smart-Connect tool-less fasteners. Clearview Blue Cassettes simply slide into building block assemblies with a “hard-stop”
feature ensuring perfect alignment every time. Additional buffer tube/ribbon slack is stored within each cassette eliminating
buffer tube congestion, pile-up or identication miscues. The dedicated “w-shaped” intrabay route scheme ensures long
term reliability of circuits by maximizing proper slack storage of any jumper length, greatly reducing the chance of jumper
tie-in or weaving. Full length doors provide complete physical ber protection when closed and instant visual and physical
access to the entire frame when opened.
Technical Specications
FieldSmart FxHD Frames
Dimensions 7.2’ H x 36” W x 18” D
Ratings Compliant to Telcordia GR-449
Port Density 2,016 SC or 4,032 LC (front access only, back-to-back mounting)
Cassette Types Supported Clearview® Blue
Connector Types SC/UPC, SC/APC, LC/UPC, LC/APC, MPO (additional options available upon request)
Cable Types Indoor Riser, Indoor Plenum, Indoor/Outdoor, Outdoor (Riser/Non-Rated), Outdoor Armored (Riser/Non-Rated), FieldShield®
Splice Capacity 12 or 24 splices in each Clearview Cassette
Storage Capacity One meter of 900 μm ber and up to three meters of jacketed ber
Cable Entry Compatibility Top and bottom (oor) entry
Caple Entry Clamp Location 16 (eight left, eight right) Note: Center clamping compatible for left and right same sheath distribution of buffer tubes/sub-units
Recommended Jumper Length Four meters, plus two meters for each additional frame
Material Stainless steel with almond powder coating

Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
4
FieldSmart®FxHD Frame
Installation Manual _________________________________________________________
Manual 014815 REV C - Feb 2018
FxHD Frame Installation
The FxHD frame system will come in a corrugated cardboard
packaging crate (44” wide x 91’” deep x 21” high (26” high with
pallet)).
Open the crate by cutting the banding straps (not shown) and
removing the top cover.
Prepare to carefully remove the contents. This should include:
1. Bulkhead
2. Base Assembly (Base Plate and Lower Trough)
3. Isolation Pad
4. (2) Doors
5. (2) End Guards
6. Top Trough Assembly
7. Grounding Bar
8. Miscellaneous Hardware
Note: The FxHD Frame system comes in two main congurations, patch only and
patch and splice. The difference is that the patch only main bulkhead does NOT
come with the ganging brackets install on the bulkhead, as the ganging brackets
will come pre-installed on the patch only cassette blocks. The patch and splice
version does come with the ganging brackets already attached to the bulkhead.
Shown is a picture of a patch and splice frame system. The areas highlighted
would not come with a patch only frame system.

5
FieldSmart®FxHD Frame
__________________________________________________________ Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
Manual 014815 REV C - Feb 2018
Remove the small spacer box from the top end of the bulkhead.
Carefully lift the bulkhead assembly out of the box and set aside.
Hold the assembly by the center portion on both ends to
prevent bending the bulkhead.
On the reverse side of the bulkhead are radius limiters. Be very
careful setting this aside. Do not drag on the oor.
Locate and remove the box labeled “Base Assembly”.
Also remove the isolation pad and the oor mounting hardware and set aside. Separate the base plate from the lower
trough by removing the screws from the front. Save these screws and set the lower trough aside. The bolts for mounting the
base to the bulkhead are taped to the inside of the base assembly.
Lift Here

Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
6
FieldSmart®FxHD Frame
Installation Manual _________________________________________________________
Manual 014815 REV C - Feb 2018
Note: It is important to build the frame system as
much as you can before mounting to the oor.
Mounting the base to the oor next to another
frame or against the wall will not allow you access
to the sides and back to complete the installation.
Stand the bulkhead up and slide the base plate into
place as shown
Note: The black plastic Building Brackets shown are
not included with a Patch Only Frame.
Attach the bulkhead to the base with the provided bolts
from the rear of the frame. Do not fully tighten the bolts
at this point.
Note: If the frame is going to be mounted against a
wall or other frame you must tighten these bolts before
putting the frame into its nal position.
Locate the boxes labeled “Right End Guard” and
“Left End Guard” and remove. The screws for
mounting the end guards will be in the box.
Now, stand the end guards
up and mount into place
one at a time. The end
guards are attached with a
row of screws on the rear
of the frame and a pair of
screws on each side at the
bottom of the frame.

7
FieldSmart®FxHD Frame
__________________________________________________________ Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
Manual 014815 REV C - Feb 2018
Locate the box labeled “Upper Trough”. Inside
the box will be a second box labeled “End-
guard Support”. Locate this box and set aside.
The upper trough is installed at the top of the
frame as shown.
The upper trough is mounted using the provided screws. The mounting locations are shown below. Install two screws on
each side from the top down, two on each side through the end guard, and two in front underneath the trough.

Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
8
FieldSmart®FxHD Frame
Installation Manual _________________________________________________________
Manual 014815 REV C - Feb 2018
Floor Installation
Tools (required or recommended):
1. Hammer (or rotary) drill (depth gauge recommended)
2. 5/8” masonry drill bit
3. Socket wrench set
4. Blowout air bulb or vacuum with small diameter tube
First determine where the frame is going to be installed. Using the isolation pad as a template, mark the 4 holes where the
frame will be secured to the oor.
Using a 5/8” masonry bit, drill the four required holes to a minimum depth of 50 mm (approx. 2”).
Note: If for some reason you have trouble drilling the 5/8” hole, we recommend rst drilling a 1/4” pilot hole before drilling
out to 5/8”.
Thoroughly clean the dust from each hole, using an air blowout or vacuum device.
Note: To not degrade the anchor’s installed performance, any unused anchor holes (or other nearby holes) in the concrete
within 3” must be lled with an epoxy ller (pour stone) or equivalent. Filled holes must be fully cured before anchors are
installed and torqued.
Place isolation pad in position over the pre-drilled holes and align as necessary. Lift frame onto isolation pad and line up
with holes.
Note: It is important to build the frame system as much as you can before mounting to the oor. Mounting the base
to the oor next to another frame or against the wall will not allow you access to the sides and back to complete
the installation.

9
FieldSmart®FxHD Frame
__________________________________________________________ Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
Manual 014815 REV C - Feb 2018
Ensure that the anchor’s expansion shield is not expanded. Place the end of the anchor into the pre-drilled hole. Repeat for
the other drilled holes. Make sure the anchor is fully embedded in the concrete.
Align the edges of the 2” square washer parallel with the slots in the frame base to obtain the maximum material overlap.
Once aligned, tap each anchor/washer assembly until it is seated in the hole and rmly against the 2” square washer.
Pre-tighten each anchor with a socket wrench or box-end wrench; do not use an open-end wrench (which could easily slip
off and cause injury). Before nal tightening, ensure that the frame is properly aligned (in the row and with any adjacent
frames). Torque each anchor to 60 ft-lbs.
Note: When using the break off type anchor, a torque wrench is not required since the anchor’s (red) torque cap shears off
at a predetermined torque value (approximately 60 ft-lbs.), leaving a green seal on the bolt head, indicating proper tighten-
ing.
The anchoring line up should look like this:
Note: Square
washers will be
packaged in base
of frames
Threaded Rod

Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
10
FieldSmart®FxHD Frame
Installation Manual _________________________________________________________
Manual 014815 REV C - Feb 2018
Raised Floor Installation
Tools (required or recommended):
1. Hammer (or rotary) drill (depth gauge recommended)
2. 5/8” masonry drill bit
3. Socket wrench set
4. Blowout air bulb or vacuum with small diameter tube
Also required is a raised oor mounting kit (Cleareld P/N 011236).
1. 1/2-13 Hex Nut (Qty 8)
2. 1/2 Lock Washer (Qty 4)
3. 1/2 Flat Washer (Qty 4)
4. 1/2-13 x 30 Threaded Rod (Qty 4)
5. Hilti HDI 1/2” Anchor (Qty 4)
6. 1/4 x 2” Flatwasher .515 Hole (Qty 8)
7. Split Tubing 30” (Qty 4)
Screw Sequence for Floor Screw Sequence for Frame
Note: Cleareld recommends installing the anchors directly into the concrete oor.
Note: It is important to build the frame system as much as you can before mounting to the oor. Mounting the base
to the oor next to another frame or against the wall will not allow you access to the sides and back to complete
the installation.