
5 6 7
9108
11 12
page 2
FLEXIBLE TANK HYDROCARBON
Date de création : 29/10/2014 DC-CN-25 Version 10 - 28/10/2021
FOR ALL THE INLETS/OUTLETS
Install the counterflange
correctly in its socket
STRETCH WITH CARE
without using tools, in order to pass
the counterflange with its seal inside
Overtightening can cause
the counterflange to break
It is necessary
to repeat
steps 8and 9
once all the parts
are installed
Optional
Follow
the instructions
for use
Use a 13mm wrench
(not provided)
13
Follow
the instructions
for use
x4
MANDATORY
Mounting pads
necessarily before filling
for each angle
Use a 10mm wrench
(not provided)
Follow the unfolding plan
attached to this installation guide
Unfold the tank according to the diagram
1 m
0,5 m
0,5 m
0,5 m
It is ESSENTIAL
to install
the tank
correctly
to fill
Overview
on low walls
Overview
on embankment
Stir the tank by the angles
from top to bottom manually
Shake and spread correctly the tank
to remove all the folds
COATED
FABRIC
This step is necessary to
pass air under the tank to facilitate
its movement and positioning