1. Installation
1.1. Foreword.
Thank you for your trust and confidence in BRICON.
This manual will give a detailed explanation of the functions of the Speedy.
BRICON wish you much enjoyment with your purchase.
1.2. Unpacking the installation.
A Speedy pack contains:
1. Speedy (ETS)
2. Speedy Carrying case
3. Holder
4. Loft antenna
5. Loft antenna cable
6. Cable for connecting antenna (short cable)
7. The power supply (12 volt transformer)
1.3. Assembly of the electronic timing system.
Attention : The first thing that one must do is to program or number the antennas (page 7).
If using more than one antenna, link the antennas together using the cables provided.
These cables have a 9-pin connection on both ends (male and female).
Connect the Speedy in the same way and finally connect the power supply. Where possible, connect
the power supply into the centre of the installation. The standard power transformer supplied is
1500mA. The power consumption of the Speedy and the antenna pads can be found on each item, and
it should be noted that installations with multiple antenna pads may need an additional power supply.
After completion, the red light on the antenna connection will light up and the Speedy will start up.
If this fails to happen, there is a cable failure or a power supply problem and these should be checked.
A diagram of the installation appears on page 5, which should be studied before installing the system.
It is possible to purchase extension cables if necessary, which can be obtained from your local dealer.
If a large number of antenna pads are connected, then an end plug will need to be connected.
If you have any questions regarding the installation please connect your Bricon dealer.
SPEEDY 4
12345,6
7