Page 4
The KL7 Series does not include a Spoilboard. You will need to build one.
We recommend you consider the following quesons to help determine
the best Spoilboard conguraon for your needs. We also have includ-
ed some ideas that may be helpful.
• With large projects, you may want to only have clamping at the edges.
• With small projects, you may need exibility with clamping.
• With tall projects, you may want a thinner Spoilboard
• A thinner Spoilboard will have more ex
• We would recommend a 0.5” to 1.0” thick baseboard and Spoilboard.
• Double sided tape
• Threaded inserts
• T-slots
• Vacuum table
Recommended Spoilboard installaon will require:
1. 16 5/16-18 x 1.5” screws and nuts
2. 4 Runner boards 3/4 x 1 x 3 pine boards 40” long
3. 1 Baseboard 1/2 to 1” plywood (36.5” x 49.5”)
4. 1 Spoilboard material nish size (36.5” x 49.5”)
Other needed material may include: Inserts, T-track, or glue depending
on your requirements for material clamping.