
Riva Plus Manual
8
IMPORTANT INFORMATION
Please read this page carefully.
• ALL BOILERS MUST BE INSTALLED IN ACCORDANCE ITH NATIONAL, STATE
AND LOCAL PLUMBING, HEATING AND ELECTRICAL CODES AND
ORDINANCES, AS ELL AS THE REGULATIONS OF THE SERVING
ELECTRICAL, ATER AND GAS UTILITIES.
• All systems should be designed by competent contractors, and only persons
knowledgeable in the layout and installation of heating systems should attempt
the installation of any boiler. It is the responsibility of the installing contractor to
see that all controls are correctly installed and operating properly when the
installation is completed.
• This boiler is intended for use, only with propane or natural gas. All flammable
liquids (especially gasoline), chemicals, rags, paper, wood scraps, debris, etc.,
should be kept away from the boiler at all times. Keep the boiler area clean and
free of all fire hazards.
• Please read the literature and warranties supplied by the manufacturers of the
various accessory equipment. This equipment is warranted by the respective
manufacturers, not by Quincy Hydronic Technologies, Inc. Each piece of
equipment must be installed and used according to the recommendations of the
manufacturer.
Codes and Regulations:
Installation of the boiler an relate equipment must conform to national, state an
local regulating agencies an co es applicable to the installation of the equipment. In the
absence of local requirements, the following co es apply:
The above co es are available from:
A. ANSI/NFPA - #70 National Electric Co e
B. ANSI/NFPA - #211 Chimneys an Vents
C. ANSI/NFPA - #Z223.1 National Fuel Gas Co e
C. ANSI/NFPA - Domestic Gas Conversion Burner
D. CAN/CGA - B149 Installation Co es
E. ANSI/ASME - CSD-1
National Fire Protection Association (NFPA)
Battery March Park
Quincy, Massachusetts, 02269
http://www.nfpa.org
CSA International
8501 E. Pleasant Valley Roa
Clevelan , OH 44134-5575
http://www.csa-international.org