Connection to the mains supply
Connection of the PDU to the mains supply* should be made by the
supplied connector (Fig 3 point A) enclosed in a suitable enclosure
accessible with use of a tool or by location accessible with the use of
a tool, connection can also be made by hard wiring to the supply
inlet**.
* Ensure the mains supply is switched off before connecting the PDU to the
mains
** Note all electrical work must be carried out by a competent person.
Storage of the PDU
The PDU MUST be stored in a dry storage area suitable for storing
electrical and electronic equipment.
Servicing of the PDU
The RCD and MCB’s should be checked at the annual service for
loose connections on the conductors and busbars.
The earth terminal should be checked at the annual service for loose
connections.
The fixing lugs on the casing should be checked for loose fixings and
damage at the annual service.
The 12V fuses should be checked for correct installation at the
annual service.