Artos MTX Manual de usuario

Machine Model MTX/STX Multi Task Wire
Processor Owners Manual
Text
PN 6-119876-1 Rev.1Date 02 Dec. 2010
Artos Engineering Company
21605 Gateway CT
Brookfield WI 53042
Phone 1 262 252 4545 Fax 1 262 252 4544
www.artosnet.com

MTX/STX OPERATORS MANUAL
Chapter Reference Guide
2.6 OR 2.7 2.9
2.5
2.10
2.3.4
2.6.4.2
2.3.1-2.2.3
2.3.6or 2.4 2.3.6 or 2.4 Refer to the Chapter
Numbers shown for
explanations of the
counter programming.
2.2.1
2.2.3 2.2.6.4.
2.2.2
10/25/04 6-119876

MTX/STX OPERATORS MANUAL
Table Of Content
1Machine Specifications And Installation.....................................................................................................5
1.1 Machine Specifications............................................................................................................................5
1.2 Machine Installation.................................................................................................................................6
1.2.1.1 INSTALLING THE COMPUTER ON THE INFEED END.................................................................................7
1.2.2 Installing The Computer On Outfeed End............................................................................................8
1.2.3 Process Station Installation................................................................................................................11
1.2.4 Collector Installation...........................................................................................................................11
1.2.5 Installing Terminal Reel Brackets.......................................................................................................12
1.2.6 Electrical Connection..........................................................................................................................12
1.2.7 Air Connection....................................................................................................................................13
1.3 Control Pushbuttons With Infeed Computer..........................................................................................14
1.3.1 Push Buttons......................................................................................................................................14
1.4 Control Pushbuttons With Out Feed Computer.....................................................................................15
1.4.1 Push Buttons......................................................................................................................................15
2Operating Software...................................................................................................................................16
2.1 Main Run Screen Definitions.................................................................................................................16
2.2 Cycle Mode Control...............................................................................................................................17
2.2.1 Cycle Mode.........................................................................................................................................17
2.2.2 Speed .................................................................................................................................................17
2.2.3 Single / Step Options..........................................................................................................................17
2.3 Manual Data Input (Mdi)........................................................................................................................17
2.3.1 Selecting An Existing Wire .................................................................................................................18
2.3.2 Creating A New Wire..........................................................................................................................18
2.3.3 Defining Wire Properties.....................................................................................................................18
2.3.4 Changing Wire Length, Strip Lengths, And Strip Pull Lengths...........................................................19
2.3.5 Short Wire Option...............................................................................................................................19
2.3.6 Loading Existing Lead Or Trail Processes.........................................................................................21
2.4 Creating New Lead Or Tail Processes..................................................................................................22
2.4.1 Determining A New Process Position.................................................................................................23
2.4.1.1 MANUALLY SETTING THE PROCESS POSITIONS ...................................................................................24
2.4.1.2 DETERMINING LEFT/RIGHT WIRE POSITION.........................................................................................25
2.4.1.3 DETERMINING IN/OUT WIRE POSITION ................................................................................................26
2.4.1.4 DETERMINING THE PROCESS HEIGHT (OPTION)..................................................................................26
2.4.1.5 DETERMINING ARRIVE AND DEPART EXTENSION .................................................................................27
2.4.1.6 SETTING THE PROCESS DEPARTURE VELOCITY AND ACCELERATION ...................................................28
2.4.1.7 DETERMINING PRE-TRIP AND POST TRIP TIME....................................................................................28
2.4.1.8 SELECTING STRIP INSPECTION,CFM,AND SPLIT CYCLE OPERATION....................................................28
2.4.1.9 HOME POSITIONS OF PIVOT,PROCESS EXTENSION,AND HEIGHT........................................................28
2.4.2 Setting Additional Process Properties................................................................................................29
2.4.2.1 SETTING THE WIRE OVERHANG VALUE...............................................................................................29
2.4.2.2 SETTING THE RETURN EXTENSION .....................................................................................................30
2.4.2.3 SETTING PROCESS STRIP PARAMETERS .............................................................................................30
2.4.2.4 NON-TERMINATING PROCESSES.........................................................................................................30
2.4.2.5 MULTIPLE SINGLE END PROCESSES ...................................................................................................30
2.5 Recalling Existing Part Programs..........................................................................................................32
2.6 Creating A New Part Program...............................................................................................................32
10/25/04 6-119876

MTX/STX OPERATORS MANUAL
2.6.1 Setting The Release Delay.................................................................................................................33
2.6.2 Setting Conveyor Speed (Option) ......................................................................................................33
2.6.3 Pre And Post Processes.....................................................................................................................33
2.6.3.1 CREATING OR EDITING APRE-PROCESS ............................................................................................34
2.6.4 Completing The New Part Program ...................................................................................................34
2.6.4.1 CREATING AN OPERATOR MESSAGE...................................................................................................34
2.6.4.2 ENTERING TOTAL AND BATCH QUANTITIES .........................................................................................35
2.6.4.3 SAVING ANEW OR EXISTING PROGRAM .............................................................................................35
2.7 Editing Existing Part Programs..............................................................................................................35
2.8 Creating A Double Program (Options Required)...................................................................................36
2.8.1 Creating A Double Program...............................................................................................................37
2.8.2 Configuring Vertical Or Horizontal Double .........................................................................................38
2.8.2.1 SEQUENCE........................................................................................................................................38
2.8.2.2 CONFIGURATION................................................................................................................................38
2.8.3 Double Termination............................................................................................................................39
2.9 Creating And Editing Job Programs......................................................................................................39
2.9.1 Creating A New Job Program.............................................................................................................40
2.9.1.1 BATCH MODE ....................................................................................................................................40
2.9.1.2 HARNESS MODE ................................................................................................................................41
2.10 File Management ..................................................................................................................................42
2.10.1 Data Organizer...................................................................................................................................42
2.10.2 Data Back Up.....................................................................................................................................42
2.11 Password Authorization ........................................................................................................................43
3Language Editor.......................................................................................................................................44
4Maintenance.............................................................................................................................................46
4.1 Lockout Procedure For Mechanical Maintenance.................................................................................46
4.1.1 Suggested Shutdown And Lock Out And Tag Out Procedure...........................................................46
4.2 Mechanical Adjustments........................................................................................................................47
4.2.1 Wire Straightener................................................................................................................................47
4.2.2 Tonking...............................................................................................................................................48
4.3 Pneumatic Tonker Option......................................................................................................................49
4.4 Blade Change........................................................................................................................................50
4.5 Feed Belt Replacement.........................................................................................................................51
4.6 Maintenance Software...........................................................................................................................52
4.7 Device Configuration.............................................................................................................................52
4.7.1 Establishing Process Station Home (Reference) Position.................................................................53
4.7.2 Establishing The Device Type............................................................................................................53
4.7.3 Setting Device Trip.............................................................................................................................53
4.7.4 Setting Station “T”...............................................................................................................................54
4.7.5 Selecting Strip Inspection, Cfm, And Air Feed Die.............................................................................54
4.7.6 Selecting Another Station...................................................................................................................54
4.8 Setting Machine Configuration Properties.............................................................................................54
4.9 Using I/O And Servo Maintenance Screens..........................................................................................57
4.9.1 Using Machine States Screen............................................................................................................57
4.9.2 Using Discrete I/O Screen..................................................................................................................58
4.9.3 Using Servo Maintenance Screen......................................................................................................59
4.9.3.1 SERVO MOTOR POSITION...................................................................................................................59
4.10 On-Line Preventative Maintenance Screens ........................................................................................60
4.11 Suggested Preventative Maintenance Schedule..................................................................................61
4.12 Drive Belt Replacement ........................................................................................................................62
4.13 Machine Reference Process.................................................................................................................62
4.13.1 Overview............................................................................................................................................62
10/25/04 6-119876

MTX/STX OPERATORS MANUAL
4.13.2 Master Reference (Mtx/Stx)...............................................................................................................62
4.13.3 Machine Reference............................................................................................................................63
4.13.4 Reference Failure Troubleshooting: ..................................................................................................64
4.13.5 Reference Pulse ................................................................................................................................65
4.13.6 Upper Cutterhead Belt.......................................................................................................................67
4.13.7 Lower Cutterhead Belts .....................................................................................................................67
4.13.8 Feed Assembly Belts.........................................................................................................................68
4.13.9 Pivot And Strip Belts..........................................................................................................................69
4.14 Master Reference Procedure................................................................................................................70
4.14.1 Centering The Cutterhead.................................................................................................................72
5Troubleshooting........................................................................................................................................73
5.1 Mtx/Stx Troubleshooting Guide.............................................................................................................73
5.2 Machine Function Error Codes..............................................................................................................76
6Appendix...................................................................................................................................................77
6.1 S-1 Option .............................................................................................................................................77
Window And Long Lead Strips...........................................................................................................79
Twister...................................................................................................................................................80
Twister Operation...............................................................................................................................80
Tinning...................................................................................................................................................81
Sonic Welding........................................................................................................................................81
Seal / Seal Crimp Application
Notes (Customer Entry) ................................................................................................................81
......................................................................................................................81
6.1.1
6.2
6.2.1
6.3
6.4
6.5
6.5.1
10/25/04 6-119876

MTX/STX OPERATORS MANUAL
1 MACHINE SPECIFICATIONS AND INSTALLATION
Thank you for your purchase of an Artos MTX/STX Series Modular Wire Processing machine. Please read the
following instructions prior to unloading and operating you machine.
1.1 MACHINE SPECIFICATIONS
The machine specifications have been provided as a general guideline to the capabilities of your new MTX/STX
machines. Your machines actual capabilities will depend on your material and application.
Wire Size: 0,15 to 6 mm2( 26 to 10 AWG)
Wire Cut Lengths: 51mm to 100M (2” to 3938”)
Wire Stripping Lengths: 0 to 12.7mm (0 to 0.5”)
Wire Feed Rate (Max.): 5M/Sec (197 inches/Sec.,)
Weight: 1818 Kg (4000lb)
Dimensions: 3.17 X 1.73 X 1.84M (125X70X73 IN.)
Electrical
1. Power Supply:
220, 380, 415, 440 VAC ±10%, 50 or 60 Hz. ±5% Three Phase
2.2 Kva (Nominal)
Included: 2 x TU10
2 x Paper Take Up
PoweredCollector
2. Connection to Supply: Fused, Lockable Disconnect
3. Protection Against Electrical Shock: Grounded Metal Enclosure
Environmental
1. Temperature:
Operating 0°C to +45°C
Storage -25°C to +55°C
2. Relative Humidity:
30% to 90% (Non Condensing)
3. Sound Level:
63 dbA Quiescent
80 dbA Automatic Cycle
Included: 2 x Gamma Presses
Passive Collector
79 dbA Automatic Cycle
Included: 2 x TU10 Presses
2 x Pawomat Seal Applicators
Powered Collector
4. Other:
This equipment is designed for normal operation in a dry location where it is not
likely to be subjected to drip, splash, or spray of water or other liquid.
.
Air Requirements: 6 Bar (80 PSI)
10/25/04 6-119876

MTX/STX OPERATORS MANUAL
1.2 MACHINE INSTALLATION
Before removing your machine, check the content of your shipment with the packing memo provided. Contact your
local Artos representative if items appear to be missing.
Your machine will be bolted to the packing skids using six bolts. Remove these bolts. Be sure support the machine
for lifting by placing the forks in the areas shown. It is important to avoid contact with the upper guard assembly and
the lift truck boom. When lifting the MTX/STX machine, be certain to use a truck capable of lifting the machine
weight.
FORK
Once lifted, remove the shipping plates. This will require a 15/16’” (24 mm) socket wrench. Insert the 6 padded feet.
Set the 4 feet on the machine frame to an equal length about half way in to the hole. Make the 2 feet on the electrical
cabinet shorter so they do not tough the floor when the machine is set in place. Lower the machine into place. Using a
machine level, adjust the 4 padded feet so the machine is level. Now turn the feet on the electrical cabinet down until
they are firmly on the floor.
10/25/04 6-119876

MTX/STX OPERATORS MANUAL
1.2.1.1 INSTALLING THE COMPUTER ON THE INFEED END
Unpack the computer, monitor, keyboard and mouse from their shipping boxes.
Control components are mounted as shown. Set down the keyboard and mouse and run cables thru the hole
provided before installing the computer.
Computer components are mounted as shown. The monitor and computer plugs into the UPS (un-interruptible
power supply) backup receptacles. The UPS connects to the appropriate cord, 110 VAC or 220 VAC (export).
The monitor, keyboard, and mouse connect to the computer as described in the computer manual (follow the color
code).
The optional UPS sets on the shelf inside
the console. Insert from the left with
control facing out. It is helpful pass the
computer and monitor power cords over
the shelf and out the hole so they can be
p
lu
gg
ed into the batter
y
bac
k
-u
p
outlets
The serial cables are marked for their respective “COM PORTS” on the computer.
10/25/04 6-119876

MTX/STX OPERATORS MANUAL
1.2.2 INSTALLING THE COMPUTER ON OUTFEED END
Unpack the computer, monitor, keyboard and mouse from their shipping boxes.
Control components are mounted as shown. Set down the keyboard and mouse and monitor. The cables are
routed through the hole in the back of the support tube.
10/25/04 6-119876

MTX/STX OPERATORS MANUAL
Feed the mouse and keyboard cable trough the tube first then the monitor cables. Bundle and tie the cables neatly
allowing enough of the bundle out of the tube to allow for rotation.
Remove the rear guard. This requires the special key that was ship with the loose parts of the machine. Inside
you will find the mating cable connections.
1. Route the cables up over the rear guard track and down along the leg on the inside.
2. Connect the cables to there respective mates.
3. The AC power connection for the monitor will be found along the sealtite bundle near the cutter head
motor.
Rear Guard
10/25/04 6-119876
Este manual sirve para los siguientes modelos
1
Tabla de contenidos
Otros manuales de Herramientas eléctricas de Artos




















