5. Power Pallet Set Up
5.1. Facility Requirements
The facility to house the power pallet must have the following characteristics:
● Level flooring made of non-flammable material capable of supporting the weight of the
machine (listed in the Specifications section).
● Facility must have a covered location to protect the power pallet from direct rain or water,
as some aspects of the system are not water/weather resistant.
● The system is to be installed with a 92 cm clearance around the footprint of the machine
and at least a 173 cm clearance above the machine. See illustration on the next page.
● Sufficient ventilation through an exhaust hood with air flow capacity adhering to local
regulations.
● Install the CO meter provided with the power pallet and verify that it functions properly.
Have a CO meter near the operating floor at all times even when the machine is not in
operation and especially when performing maintenance.
● Operate the power pallet in locations having a max temperature of 40 °C and at an
altitude of 1000m or less. The power pallet’s power output will be derated at higher
altitudes. In case of different conditions, please consult ALL Power Labs.
● Install the PP30 out of direct sunlight. UV from sunlight will damage parts over time.