11/19/19
1
-24
Released
S.
Powers
3/9/2020
8
Added note for medium torque
S. Powers
7/29/2020
23
Added note for orientation of roll pin
S. Powers
Tools needed:
•Cordless drill with #2 Philips drive tip
• 7/16” Socket driver for cordless drill
• 5/32” Allen for cordless drill
• Ratchet with 7/16” socket
•Philips screw driver #1 and #2
•Flat head screw driver #1 and #2
•Mallet
•Level
•Tape Measure

12345
Matrix 2019
www.ais-inc.comwww.ais-inc.com 2
90°Frame Connection
P-MXINSTRUCT01 Rev 07.29.2020
IMPORTANT INSTRUCTIONS:
•Place first bolt at top of frame, below first
electrical chase hole. This hole is round
and will align frames vertically. All other
bolt locations are slots.
•Thread all bolts loosely, making sure
bolts are properly threaded to prevent
cross-stripping. Tighten top bolt first,
then tighten all remaining bolts to approx.
100 inch lbs torque, or using a 12 volt
drill on medium torque.
Required hardware:
¼-20 x 2 ¼” Hex Bolt
#RP-M2BOLT1
Use 7/16” magnetic hex drive
82H Frame = 5 bolts
50-66H Frame = 4 bolts
34-42H Frame= 3 bolts
¼-20 Tinnerman Nut
#RS-HNC33892
(Factory installed, on one side of
frame. Installers may be required to
remove from frames if connecting to
2-way, 3-way or 4-way connector)
1/8”
Top View
Side View
90°Connector
(2-way, 3-way or 4-way)
¼-20 Tinnerman Nut
May have moved during shipping.
To re-center, briefly insert
#2 philips screw driver through
connector hole into the
tinnerman nut.
¼-20 x 2 ¼” Hex Bolt
First bolt must be installed at
top of frame to ensure proper
vertical alignment
If necessary, remove
¼-20 Tinnerman Nut
located on frames prior
to bolting on connector

12345
Matrix 2019
www.ais-inc.comwww.ais-inc.com 3
Straight Frame Connection
P-MXINSTRUCT01 Rev 07.29.2020
¼-20 Tinnerman Nut
May have moved during shipping.
To re-center, briefly insert #2
philips screw driver through frame
hole into the tinnerman nut.
IMPORTANT INSTRUCTIONS:
•Line up frames, adjust glides as
necessary to ensure frames are
approximately the same height.
•Place first bolt at top of frame, below first
electrical chase hole. This hole is round
and will align frames vertically. All other
bolt locations are slots.
•Thread all bolts loosely, making sure
bolts are properly threaded to prevent
cross-stripping. Tighten top bolt first,
then tighten all remaining bolts to approx.
100 inch lbs torque, or using a 12 volt
drill on medium torque.
Required hardware: ¼-20 x 4” Hex Bolt
#RP-M2 BOLT2
82H Frame = 5 bolts
50-66H Frame = 4 bolts
34-42H Frame = 3 bolts
Use 7/16” magnetic hex drive
¼-20 Tinnerman Nut
#RS-HNC33892
(Factory installed on one side only.
Installers may be required to remove if
connecting to 2-way, 3-way or
4-way connector)
¼-20 x 4” Hex Bolt
First bolt must be installed at
top of frame to ensure proper
vertical alignment
Top View
Side View
Flush
Flush

12345
Matrix 2019
www.ais-inc.comwww.ais-inc.com 4
Stack-On FrameAssembly
P-MXINSTRUCT01 Rev 07.29.2020
Required hardware:
¼-20 x 5/8” Button Head Screw
#RP-M2BOLT3
Use with 5/32 allen wrench
16 places
Bayonnett
#RP-M2VSB-C
4 places
“TOP” goes up into
Stack Frame
¼-20 x 5/8” Button Head Screw
8 places
IMPORTANT INSTRUCTIONS:
•Make sure screws are properly threaded
into bayonnett before tightening.
INCORRECT
CORRECT INCORRECT INCORRECT

12345
Matrix 2019
www.ais-inc.comwww.ais-inc.com 5
Stack-On FrameAssembly Cont.
P-MXINSTRUCT01 Rev 07.29.2020
IMPORTANT INSTRUCTIONS:
•Make sure screws are properly threaded
into bayonnett before tightening
•Stack-On Frames may be retrofit over
cables run in top cap channel. USE
CAUTION to avoid damaging cables
¼-20 x 5/8” Button Head Screw
8 places
“A”
“B”
“B”
“A”

12345
Matrix 2019
www.ais-inc.comwww.ais-inc.com 6
P-MXINSTRUCT01 Rev 07.29.2020
Stack-On Connectors
#10-32 Hex Nut
Remove Base Connector Vertical Cover:
1. Remove and save #10-32 Hex Nuts and
Bolts at top of Connector (2 places)
2. Slide Vertical Cover up approximately ¾”
to release it from the bottom tabs.
Up
Required hardware: ¼-20 x 2 ¼” Hex Bolt
#RP-M2BOLT1
Use 7/16” magnetic hex drive
2-way Connection = 4 bolts
3-way Connection = 6 bolts
4-way Connection = 8 bolts
¼-20 Tinnerman Nut
#RS-HNC33892
(Factory installed, on one side of
frame. Installers may be required to
remove from frames if connecting to
2-way, 3-way or 4-way connector)
Stack-On
Connector
¼-20 Tinnerman Nut
May have moved during shipping.
To re-center, briefly insert
#2 philips screw driver through
connector hole into the
tinnerman nut.
¼-20 x 2 ¼” Hex Bolt
First bolt must be installed at
top of frame to ensure proper
vertical alignment
IMPORTANT INSTRUCTIONS:
•Place first bolt at top of frame, below
first electrical chase hole. This hole is
round and will align frames vertically. All
other bolt locations are slots.
•Thread all bolts loosely, making sure
bolts are properly threaded to prevent
cross-stripping. Tighten top bolt first,
then tighten all remaining bolts to
approx. 100 inch lbs torque, or using a
12 volt drill on medium torque.
Lift off
Vertical Cover

12345
Matrix 2019
www.ais-inc.comwww.ais-inc.com 7
P-MXINSTRUCT01 Rev 07.29.2020
Stack-On Connectors Cont.
Required hardware:
#10-32 x 3/8” Hex Head Bolt
#RP-MXCONBOLT
Use 5/16” hex drive
#10-32 Hex Nut
#RP-MXCONNNUT
Use 3/8” hex drive
1. LOOSELY re-install
#10-32 Hex Nut and
Bolts onto Stack-On
Connector
Vertical Cover
Install (taller) Base Connector Vertical Cover:
2. Slide Vertical Cover up,
making sure to capture Hex
Bolt heads on the Connector
Top, into the grooves on the
vertical cover.
¼”
3. Slide the Vertical Cover back
down, making sure to capture the
tabs on the bottom of the
Connector. Vertical Cover must be
¼” from top of Connector
4. Tighten #10-32 Hex Nuts to Secure
Vertical Cover. DO NOT over tighten.
Tabs

12345
Matrix 2019
www.ais-inc.comwww.ais-inc.com 8
Top and Bottom Tile Retainers
P-MXINSTRUCT01 Rev 07.29.2020
Top Tile Retainer
2 places
Bottom Tile Retainer
2 places
Matrix Frame
(50H x 36W shown)
Required hardware:
#8-32 x 5/16” Pan Head
Machine Screw
#RP-MXHS83214
Use philips drive #2
4 places
Clip Assembly
#RP-M2TCLIP
Use philips drive #2
4 places
#8-32 x 5/16”
Pan Head Machine Screw
Philips Drive #2
4 places
Clip Assembly
4 places
IMPORTANT INSTRUCTIONS:
Set cordless drill to medium torque
to prevent stripping

12345
Matrix 2019
www.ais-inc.comwww.ais-inc.com 9
P-MXINSTRUCT01 Rev 07.29.2020
Off-Modular Frames
Required hardware:
#8-32 x 5/16” Pan Head Machine Screw
#RP-MXHS83214
Use philips drive #2
4 places
#8-32 x 5/16” Pan Head
4 places
Off-Modular Rail
Off-Modular Slide Plate
#RP-M2OMSP
Slide into Rail channel
¼-20 x 2” Hex Bolt
#RP-M2BOLT1
Use 7/16” magnetic hex drive
2 places
¼-20 x 5/8” Button Head Screw
#RP-M2BOLT3
Use with 5/32 allen wrench
2 places
Off-Modular Panel Bracket
#RP-M2OMMB
¼-20 x 5/8” Button Head Screw
2 places
Make sure bracket is in the
correct location according to plan
before tightening

12345
Matrix 2019
www.ais-inc.comwww.ais-inc.com 10
P-MXINSTRUCT01 Rev 07.29.2020
Off-Modular Frames Con’t.
¼-20 x 2” Hex Bolt
2 places
Adjacent Matrix Frame
Tabla de contenidos